    [vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”grid” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column width=”1/6″][/vc_column][vc_column width=”2/3″][ultimate_spacer height=”40″ height_on_tabs=”30″ height_on_tabs_portrait=”30″ height_on_mob_landscape=”30″ height_on_mob=”30″][vc_column_text]

    Projects

    [/vc_column_text][/vc_column][vc_column width=”1/6″][/vc_column][/vc_row][vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”grid” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column]

    Luchterduinen

    Providing senior management Project Director services for the design, fabrication, installation and commissioning of offshore windfarm Luchterduinen. Reporting to the board of directors. Luchterduinen commissioning was completed summer 2015. Offshore windfarm Luchterduinen is located 23 km offshore in The Netherlands and consists of 43 of the Vestas V-112 3 MW turbines. The total installed offshore capacity is 129 MW. Luchterduinen is owned 50/50 by Eneco and Mitsubishi Corporation. Total project value is approximately 460,000,000 EURO.

    Prinses Amalia

    Providing Project Management services for the Prinses Amalia OWF export cable re-burial campaign for Eneco B.V.. This project took place early summer 2017 and was successfully executed.

    Norther

    Providing senior management Project Director services for the development, design, fabrication, installation and commissioning of offshore windfarm Norther. Reporting to the board of directors. Norther commissioning will be completed summer 2019.<br /> Offshore windfarm Norther is the biggest OWF in Belgium located 23 km offshore and consisting of 44 V-164 8,4 MW turbines. The total installed capacity will be 370 MW. Project owners are Elicio NV, Eneco B.V. and Diamond Generating Europe (a wholly owned subsidiary of Mitsubishi Corporation). Financial close or FID was achieved in December 2016 with commissioning or COD in Summer 2019. Norther is non-recourse financed with a lender equity portion of approx. 790 mio EUR. Total project cost is approximately 1,055,000,000 EURO